Double layer roll forming machine with tile panel and trapezoidal sheet
This is Double layer roll forming machine with tile panel and trapezoidal sheet , suitable for PPGI material and other harder coils , the finished sheet usually worked for roof and wall panel . It has beautiful water wave design , now is widely used in all over the world .Fully Automatic Metal
Double deck Tile Roof sheet roll forming machine
Double Layer for Corrugated and Trapezoidal Metal Sheet Roof Tile roll forming Machine Parameters
Coil required |
Material |
PPGI GI AL |
Width |
914/925/1000/1200/1220/1250mm |
Thickness |
0.3-0.7mm , as custom order |
Power required |
Power |
380V 50Hz 3 Phase , as custom order |
Main Motor |
5.5KW Siemens Brand |
Cutting Motor |
4KW Siemens |
Machine |
Support Frame |
400 H Steel 10mm |
Forming Station |
14 rows as profile |
Structure |
18-20mm |
Shaft |
75mm |
Roller |
45# Steel with heat treatment |
Chains |
1.2 inch |
Bearings |
Standard as custom order |
Speed |
15-30m/min |
Electric Components |
Delta and Siemens |
Size |
7.5*1.3*1.6M |
Weight |
4T |
Detailed image
Packing and Shipping
1. AG/Pbr Roof R Panel Wall Panel Roll Forming Machine Profile Sheet Making Machine need one 20/40 feet container to load .
2.We have professional technicians for loading to make sure machine has no damage.
3.Please provide us the nearest port name, we will ask shipping cost and arrange shipping for you.
Company Introduction
FAQ
1. Can you make the machine according to my design or photo type?
A: Yes. We have an experienced engineers to work out the most suitable design and production plan for the machine.
2: How can we be assured that you will deliver us quality machine with spare parts?
A:1. Customers to send the technical people to our factory for checking the quality.
2.We can send the technicians to the buyer`s factory for the installation and trainning .
3.What about your warranty?
A: Within the One-YEARS period, we could supply you the replacement parts for free .
If any damaged parts caused by quality problems after two years,we will also help but customer pay the cost .